Type of testing completed
|
Manual black-box. Usability, configuration, integration and functionality testing.
|
|
Key challenges and actions for project completion
|
The project main target was testing user interface and usability of desktop application under different operation systems (Windows, Linux and Mac OS) and creation of use-cases and documentation for existing system. The project methodology was RUP.Different testing types and techniques were used.
The system was completely evaluated in scope of usability and documented for end-user. All test-cases were based on use-cases and then transformed into user documentation. All project documents and reports were sent to customer according to process control management procedure.
|